Keyword | CPC | PCC | Volume | Score | Length of keyword |
---|---|---|---|---|---|
method statement for copper pipe installation | 1.04 | 0.7 | 3167 | 35 | 45 |
method | 1.88 | 0.7 | 9040 | 28 | 6 |
statement | 1.85 | 0.6 | 9329 | 56 | 9 |
for | 1.31 | 1 | 3485 | 33 | 3 |
copper | 1.29 | 1 | 357 | 12 | 6 |
pipe | 1.63 | 0.4 | 8136 | 37 | 4 |
installation | 0.13 | 0.6 | 531 | 76 | 12 |