Keyword | CPC | PCC | Volume | Score | Length of keyword |
---|---|---|---|---|---|
estimated cost of construction in vaar | 1.3 | 0.8 | 9932 | 79 | 38 |
estimated | 1.65 | 0.7 | 4094 | 81 | 9 |
cost | 0.13 | 0.5 | 8296 | 28 | 4 |
of | 1.92 | 0.8 | 5440 | 49 | 2 |
construction | 1.37 | 0.9 | 3445 | 94 | 12 |
in | 1.13 | 0.1 | 8215 | 20 | 2 |
vaar | 0.22 | 0.5 | 5544 | 12 | 4 |
Keyword | CPC | PCC | Volume | Score |
---|---|---|---|---|
estimated cost of construction in vaar | 1.74 | 0.9 | 8075 | 55 |